Basic requirement
Cement concrete foundation, solid and flat ,and there must be a drainage slope ;

Construction Technology
1 Repairing the foundation
Fill and level cracks or uneven areas on foundation
2 Marking the construction area
3 Mark the Dividing line of the area and the separation line on it .
4 Installation of EPDM surface
Brush the binder on the base floor, put the mixed granules on it, and then make the surface flat.
5 Drawing line
When EPDM surface is finished, keep it dry. Then draw the white line according the standard size.